The Connect the Grid Act removes several Federal Power Act exemptions affecting ERCOT and entities otherwise exempt under section 201(f), expanding federal requirements for the Texas grid. Within six months, the Federal Energy Regulatory Commission must hold a technical conference and publish the compliance steps for affected entities.

Within 30 days, FERC must order the national Electric Reliability Organization to propose a reliability standard setting minimum transfer capability between ERCOT and the Southwest Power Pool, Midcontinent Independent System Operator, and neighboring balancing authorities in the Western Interconnection. The bill supplies a range for each interface. The standard may be approved only if each paired region jointly submits a plan within one year that names entities to build or modify transmission and schedules completion by January 1, 2037.

Those plans must prioritize grid-enhancing technologies, existing rights-of-way, degraded land, renewable-energy access, community involvement, Tribal consultation, labor outreach, registered apprenticeships, and prevailing wages. Covered projects remain subject to the National Environmental Policy Act and Endangered Species Act. The Energy Secretary must consider national-interest transmission-corridor designation for affected areas.

The Energy Department also must report to Congress within one year on the reliability, climate, and cost benefits of stronger electric interconnection with Mexico and identify projects offering the greatest combined benefits.

Who Benefits and How

Texas electricity customers and neighboring grid users benefit from greater transfer capacity and reduced isolation during supply emergencies. Transmission developers, grid-enhancing-technology suppliers, renewable generators, registered apprentices, and construction workers paid prevailing wages gain project and employment opportunities. Environmental-justice communities, Tribal communities, and labor organizations benefit from required outreach and participation opportunities.

Who Bears the Burden and How

ERCOT, neighboring transmission organizations, balancing authorities, and designated transmission builders must plan, site, finance, construct, or modify facilities by the statutory deadline. Utilities and electricity customers may bear project and compliance costs even as reliability improves. FERC, the Electric Reliability Organization, and Energy Department staff must write standards, oversee joint plans, convene technical assistance, evaluate corridor designations, and complete the Mexico study. Project developers must satisfy environmental review, outreach, apprenticeship, and wage requirements.

Key Provisions

  • Expands specified Federal Power Act requirements affecting ERCOT and otherwise exempt entities.
  • Requires FERC to convene a compliance conference within six months.
  • Directs a proposed interregional transfer-capability reliability standard within 30 days.
  • Requires joint transmission plans from ERCOT and each neighboring grid region within one year.
  • Mandates completion of planned facilities or modifications by January 1, 2037.
  • Prioritizes grid technology, existing corridors, degraded land, renewable access, community participation, apprenticeships, and prevailing wages.
  • Preserves National Environmental Policy Act and Endangered Species Act review for covered projects.
  • Requires an Energy Department study of electric interconnection with Mexico within one year.

Evidence Chain:

This summary is generated from the full bill text using AI analysis. Expand "Detailed Analysis" below for identified beneficiaries/burden bearers with clause-level evidence links.

At a Glance

What This Bill Does

Extends specified Federal Power Act requirements to ERCOT, directs mandatory transfer capability and transmission planning between ERCOT and neighboring grids by 2037, and requires a federal study of interconnection with Mexico.

Key Policy Areas

Electric Reliability, Transmission Infrastructure, Federal Energy Regulation, ERCOT, Regional Interconnection, Environmental Review, Energy Workforce

Primary Purpose

Extends specified Federal Power Act requirements to ERCOT, directs mandatory transfer capability and transmission planning between ERCOT and neighboring grids by 2037, and requires a federal study of interconnection with Mexico.

Policy Domains

Electric Reliability Transmission Infrastructure Federal Energy Regulation ERCOT Regional Interconnection Environmental Review Energy Workforce

Section 2 Federal Power Act jurisdiction affecting ERCOT

Identified Gains
  • Texas electricity customers seeking federal reliability oversight
  • Neighboring grid operators coordinating with ERCOT
  • FERC electric-reliability oversight staff
  • Transmission customers using ERCOT interfaces
Model: codex-gpt-5 | Version: bill_summary_v2 | Source: ih
FERC electric-reliability oversight staff:
Transmission customers using ERCOT interfaces:
Neighboring grid operators coordinating with ERCOT:
Texas electricity customers seeking federal reliability oversight:
Identified Costs
  • ERCOT compliance staff
  • Texas utilities newly subject to federal requirements
  • Section 201(f) electric entities affected by the amendments
  • FERC technical-conference staff
  • FERC compliance-guidance staff
Model: codex-gpt-5 | Version: bill_summary_v2 | Source: ih
ERCOT compliance staff:
FERC compliance-guidance staff:
FERC technical-conference staff:
Texas utilities newly subject to federal requirements:
Section 201(f) electric entities affected by the amendments:

Section 5 Energy Department study of Mexico interconnection

Identified Gains
  • Congressional energy policymakers
  • U.S. transmission planners evaluating Mexico links
  • Texas electricity customers evaluating Mexico links
  • Mexico interconnection developers
Model: codex-gpt-5 | Version: bill_summary_v2 | Source: ih
Congressional energy policymakers:
Mexico interconnection developers:
U.S. transmission planners evaluating Mexico links:
Texas electricity customers evaluating Mexico links:
Identified Costs
  • Energy Department interconnection analysts
  • Energy Department report-production staff
  • Federal energy-study accounts
  • Grid operators supplying study data
Model: codex-gpt-5 | Version: bill_summary_v2 | Source: ih
Federal energy-study accounts:
Grid operators supplying study data:
Energy Department report-production staff:
Energy Department interconnection analysts:

Section 3 transfer-capability standard and construction plans

Identified Gains
  • Texas electricity customers exposed to grid isolation
  • Neighboring electricity customers
  • Interregional transmission developers
  • Grid-enhancing technology suppliers
  • Renewable generation developers
  • Registered electrical apprentices
  • Transmission construction workers receiving prevailing wages
  • Environmental justice communities near planned projects
  • Tribal communities near planned projects
Model: codex-gpt-5 | Version: bill_summary_v2 | Source: ih
Renewable generation developers:
Neighboring electricity customers:
Registered electrical apprentices:
Grid-enhancing technology suppliers:
Interregional transmission developers:
Tribal communities near planned projects: ,
Texas electricity customers exposed to grid isolation:
Environmental justice communities near planned projects: ,
Transmission construction workers receiving prevailing wages:
Identified Costs
  • ERCOT transmission-planning staff
  • SPP transmission-planning staff
  • MISO transmission-planning staff
  • Western balancing authorities selected for planning
  • Electric Reliability Organization standards staff
  • FERC reliability-standard staff
  • Designated transmission builders
  • Electricity customers funding transmission projects
Model: codex-gpt-5 | Version: bill_summary_v2 | Source: ih
FERC reliability-standard staff:
SPP transmission-planning staff:
Designated transmission builders:
MISO transmission-planning staff:
ERCOT transmission-planning staff:
Electric Reliability Organization standards staff:
Electricity customers funding transmission projects:
Western balancing authorities selected for planning:

Legislative Progress

In Committee
Introduced Committee Passed
Feb 26, 2026

Referred to the House Committee on Energy and Commerce.

Feb 26, 2026

Introduced in House

Feb 26, 2026

Mr. Casar (for himself, Ms. Ocasio-Cortez, Ms. Escobar, Ms. Garcia …

Stakeholder Effects

cui bono?

How this legislation distributes effects. Mention counts reflect frequency, not effect magnitude.

Utilities
20 mentions across 4 clauses
+7 positive -8 negative ~2 mixed ?3 uncertain

ERCOT compliance staff, ERCOT transmission-planning staff, Electric Reliability Organization standards staff

Positive-direction: Neighboring electricity customers, Neighboring grid operators coordinating with ERCOT, Texas electricity customers evaluating Mexico links, Texas electricity customers exposed to grid isolation, Texas electricity customers seeking federal reliability oversight, Transmission customers using ERCOT interfaces, U.S. transmission planners evaluating Mexico links

Negative-direction: ERCOT compliance staff, ERCOT transmission-planning staff, Electric Reliability Organization standards staff, MISO transmission-planning staff, SPP transmission-planning staff, Section 201(f) electric entities affected by the amendments, Texas utilities newly subject to federal requirements, Western balancing authorities selected for planning

Government
7 mentions across 3 clauses
+1 positive -6 negative

Congressional energy policymakers, Energy Department interconnection analysts, Energy Department report-production staff

Positive-direction: Congressional energy policymakers

Negative-direction: Energy Department interconnection analysts, Energy Department report-production staff, FERC compliance-guidance staff, FERC reliability-standard staff, FERC technical-conference staff, Federal energy-study accounts

Energy
3 mentions across 2 clauses
+2 positive ?1 uncertain

Grid-enhancing technology suppliers, Renewable generation developers

Labor
3 mentions across 2 clauses
+2 positive ?1 uncertain

Registered electrical apprentices, Transmission construction workers receiving prevailing wages

Civil Rights/Civil Liberties
2 mentions across 2 clauses
+1 positive ?1 uncertain

Environmental justice communities near planned projects

Tribal Nations
2 mentions across 2 clauses
+1 positive ?1 uncertain

Tribal communities near planned projects

Construction
1 mention across 1 clause
~1 mixed

Designated transmission builders

4/6
sections analyzed
Full impact breakdown

Bill Structure & Actor Mappings

Who is "The Secretary" in each section?

Domains
Electric Reliability Federal Energy Regulation ERCOT
Actor Mappings
"ercot"
→ Electric Reliability Council of Texas
"commission"
→ Federal Energy Regulatory Commission
"exempt_entity"
→ Electric entity otherwise exempt under Federal Power Act section 201(f)
Domains
Electric Reliability Transmission Infrastructure Regional Interconnection Environmental Review Energy Workforce
Actor Mappings
"ercot"
→ Electric Reliability Council of Texas
"commission"
→ Federal Energy Regulatory Commission
"neighboring_region"
→ SPP, MISO, or a neighboring Western Interconnection balancing authority
"reliability_organization"
→ Electric Reliability Organization
Domains
Electric Reliability Transmission Infrastructure Regional Interconnection
Actor Mappings
"congress"
→ Congress receiving the study
"energy_secretary"
→ Secretary of Energy
"interconnection_planner"
→ Entity evaluating U.S.-Mexico generation and transmission interconnection

Key Definitions

Terms defined in this bill

5 terms
"ERCOT" §6(e)

The Electric Reliability Council of Texas.

"environmental justice community" §6(f)

A represented community of color, low-income community, or Tribal or Indigenous community facing greater adverse health or environmental effects.

"grid-enhancing technology" §6(g)

A solution that increases the transfer capability of high-voltage transmission facilities.

"total transfer capability" §6(m)

Total transfer capability under the cited FERC regulation as in effect on enactment day.

"Tribal and Indigenous community" §6(p)

A population belonging to a federally or state-recognized Tribe, Alaska Native or Native Hawaiian organization, or another Indigenous community in a state.

We use a combination of our own taxonomy and classification in addition to large language models to assess meaning and potential beneficiaries. High confidence means strong textual evidence. Always verify with the original bill text.

Learn more about our methodology